PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Curtain wall mullions at 2nd floor South Elevation.jpg Installing copper piping at the 3rd floor Facing East.jpg Installing junction boxes outside Stair -4 Facing East.jpg Installing waste and vent piping at the 3rd floor Facing South.jpg Laying block at corridor 149 Facing West.jpg Laying out block at divider wall detention cells Facing East.jpg Black Iron duct work at the 4th Floor Facing Nouth-East.jpg Installing door frames at the 3rd floor Facing East.jpg Installing wood block along the parapet Facing East.jpg
Previous pageNext page Laying block at corridor 149 Facing West
Laying block at corridor 149 Facing West